The Tribeca skyline, including the Independence Plaza towers, seen from Pier 26 in Hudson River Park
Development Tracker — Tribeca

What's Being Built in Tribeca? A Proposed 1,090-Foot Tower, Stalled Pits Brought Back to Life & Rabsky's Two Big Bets

Hush Street tracks what's changing in Tribeca: the proposed Independence Plaza tower, Rabsky's condo tower at 65 Franklin, Tribeca's largest office-to-condo conversion, long-empty lots finally moving, and new homes inside the landmark districts.
13
Projects Tracked
1
Under Construction
4
Permitted
8
Proposed or in Review
Oct. 2026
Updated
What’s Changing
→
DOB issued a structural permit for new shoring at 65 West Broadway, clearing the way to build on a lot that sat empty for about a decade.Oct. 2026
→
A concrete-placing-boom permit was issued for the 101 Franklin Street office-to-condo conversion.Oct. 2026
→
City Planning held the environmental scoping meeting for the proposed 1,090-foot tower at Independence Plaza.Jun. 2026
267 Broadway Site purchase (TRD)$30M
65 West Broadway Site purchase (TRD)$24M
See the sites →

Hush Street is tracking what’s being built in Manhattan’s Tribeca.

Much of Tribeca sits inside its four landmark districts, so new buildings here are rare, small and slow to approve. That makes the handful of real sites matter. Several of the most prominent have sat empty for years, and 2026 is the year many of them came back: Rabsky’s condo tower at 65 Franklin has its permits after years as a stalled pit, a decade-old empty lot at 65 West Broadway has new owners and a shoring permit, and Rabsky also bought the Art Deco building at 267 Broadway to clear the site.

Above all of it is one proposal of a different scale: a 1,090-foot, 72-story tower at Independence Plaza that has just entered environmental review.

Where DOB records and press reports disagree on heights or unit counts, both are given. A permit is not treated as proof that construction has started.

Project Location Status
1Independence Plaza Tower Greenwich St. at Jay St. Proposed (Environmental Review)
265 Franklin Street Broadway at Franklin St. Permitted
3101 Franklin Street Church St. at Franklin St. Under Construction
4267 Broadway Broadway at Chambers St. Demolition Filed
521 Park Place 21 Park Pl. Filed (Plan Review)
6317 Broadway Broadway at Thomas St. Filed; Site Work Permitted
780 West Broadway West Broadway at Warren St. Demolition; Building in Review
865 West Broadway West Broadway at Warren St. Permitted
956 North Moore Street 56 N. Moore St. Permitted
10139 Franklin Street 139 Franklin St. Permitted
1131-35 Lispenard Street Church St. at Lispenard St. Landmarks-Approved
121 Walker Street West Broadway at Walker St. Filed (Plan Review)
13Hudson River Park Estuarium (Pier 26) Pier 26 Filed (Plan Review)

Towers, Revived Sites & One Very Big Proposal

Eight sites along Tribeca’s edges, from a supertall plan at Independence Plaza to empty lots on Broadway and West Broadway finally moving.

1

Independence Plaza Tower

Google Maps of Independence Plaza, 310 Greenwich Street, New York, NY
Independence Plaza, where the tower is proposed, via Google Maps. — Imagery: Google Maps
Address/LocationIndependence Plaza, Greenwich Street at Jay Street
Developer/ApplicantVornado Realty Trust and Stellar Management (City Planning applicant: Stellar Management)
ProjectA proposed 1,090-foot, 72-story residential tower plus three podium buildings of about 125 feet on the Independence Plaza campus. Reported unit counts are 922 new apartments (Tribeca Citizen) and 976, including 251 affordable (The Broadsheet); neither figure is in a filing yet.
StatusProposed (Environmental Review)
Latest UpdateCity Planning held the public scoping meeting for the project’s environmental impact statement in late June 2026 (ZAP 2023M0117). The draft statement has not been issued.

Among the Tallest Proposals in the City

The plan does not need a full ULURP land-use vote, but it does require an environmental impact statement, and Tribeca Citizen reported a construction window of 2028 to 2032. Community Board 1 has asked for at least 464 affordable apartments, far more than the 251 proposed, according to The Broadsheet, and the Tribeca Trib reported that opponents expect to sue.

There is no DOB new-building filing yet. The environmental review alone is expected to take more than a year.

Sources: NYC Planning ZAP 2023M0117; Tribeca Citizen (June 2026); The Broadsheet (July 2026); Tribeca Trib

2

65 Franklin Street

Google Street View of 65 Franklin Street, New York, NY
65 Franklin Street, via Google Street View. — Imagery: Google Street View
Address/Location65 Franklin Street, southeast corner of Broadway and Franklin
Developer/ApplicantSky Equity Group, a Rabsky Group affiliate; COOKFOX Architects
ProjectA 24-story, 293-foot condo tower with 107 apartments and about 235,000 square feet, per Tribeca Citizen, built partly with development rights transferred from landmarked buildings at 356 and 361 Broadway. The current DOB filing, which predates that approval, lists 19 stories and 77 units.
StatusPermitted
Latest UpdateCity Planning completed the landmark air-rights certification and authorization on June 12, 2026. DOB has since issued foundation, excavation and structural permits, a general construction permit (June 16) and a sidewalk shed permit (Oct. 14, 2026).

A Stalled Pit, Revived

The corner sat as an excavated, stalled site after an earlier developer’s plan collapsed around 2019. Rabsky bought it in September 2025 for about $47.5 million and has $320 million in construction financing, according to CityRealty.

The general construction permit is issued, but Hush Street has not yet confirmed work on site.

Sources: NYC DOB NOW job M01243425-I1 and permits for BIN 1001840 (accessed Oct. 2026); NYC Planning ZAP 2025M0449; Tribeca Citizen (Mar. 2026); New York YIMBY (Nov. 2025); CityRealty

3

101 Franklin Street

Google Street View of 101 Franklin Street, New York, NY
101 Franklin Street, via Google Street View. — Imagery: Google Street View
Address/Location101 Franklin Street, also 250 Church Street
Developer/ApplicantSkylight Real Estate Partners, Cannon Hill Capital Partners and TPG; Steven Harris Architects (design) and Hill West Architects (architect of record)
ProjectConversion of an office building into 72 condominiums, expanding it from 17 to 21 stories and 304 feet, about 251,000 square feet, with 15 parking spaces.
StatusUnder Construction
Latest UpdateDOB issued a concrete-placing-boom permit on Oct. 21, 2026. In September, The Real Deal reported that Corcoran Sunshine would handle sales, with the offering plan expected within about a month.

Tribeca's Largest Office-to-Condo Conversion

City Planning approved the bulk and parking authorizations for the conversion in May 2026 (ZAP 2025M0291), and DOB permits for excavation support and foundations followed in February and April. A 2017 plan for the same building called for 105 units on 17 floors; the current design has fewer, larger homes.

Sources: NYC DOB NOW job M00512217 and permits for BIN 1001971 (accessed Oct. 2026); NYC Planning ZAP 2025M0291; New York YIMBY (Mar. 2026); The Real Deal (Sept. 2026); Accurise Consulting

4

267 Broadway

Google Street View of 267 Broadway, New York, NY
267 Broadway, via Google Street View. — Imagery: Google Street View
Address/Location267 Broadway, facing City Hall Park
Developer/ApplicantRabsky Group (DOB demolition owner: HSD Construction LLC)
ProjectA planned luxury condo development replacing a five-story 1936 Art Deco building on the corner of Broadway and Chambers Street. Tribeca Citizen reported it could be a roughly 45-story, 600-foot condo or hotel building; no new-building plan has been filed.
StatusDemolition Filed
Latest UpdateRabsky bought the building for $30 million in May 2026 and filed to demolish it. DOB approved the demolition’s means and methods in August and issued a sidewalk shed permit on Oct. 21, 2026.

Rabsky's Second Tribeca Site

Earlier owners floated a 42-story condo-and-hotel plan and a 49-story hotel here; none was built. Rabsky, also behind 65 Franklin Street, has filed only for demolition so far, so the height and unit count of whatever replaces the Art Deco building are not yet known.

The site is on the west side of Broadway just south of Chambers, on the line between Tribeca and the Civic Center.

Sources: NYC DOB NOW job M01404775-I1 (accessed Oct. 2026); The Real Deal (May 2026); Tribeca Citizen (May 2026)

5

21 Park Place

Google Street View of 21 Park Place, New York, NY
21 Park Place, via Google Street View. — Imagery: Google Street View
Address/Location21 Park Place, between Church Street and Broadway
Developer/ApplicantPARC New York LLC (Paul Reehling, per YIMBY; Tribeca Citizen names Troy Realty Capital); BKSK Architects
ProjectA 28-story, 325-foot condo tower with 25 residences and about 77,600 square feet, per YIMBY. The DOB filing lists 14 units and about 48,100 square feet.
StatusFiled (Plan Review)
Latest UpdateThe new-building application filed in December 2025 is still in DOB plan review; one related filing was approved on July 29, 2026.

Rebuilding After a Collapse

This is the former Tent & Trails building, left as a shell after a 2018 collapse that was followed by a lawsuit involving the neighboring building at 19 Park Place, Tribeca Citizen reported. A 2019 plan for a 14-story hotel was disapproved. Tribeca Citizen reported that construction was expected around mid-2026; DOB records do not yet show the building permitted.

Sources: NYC DOB NOW job M01318077-I1 (accessed Oct. 2026); New York YIMBY (Dec. 2025); Tribeca Citizen (Dec. 2025)

6

317 Broadway

Google Street View of 317 Broadway, New York, NY
317 Broadway, via Google Street View. — Imagery: Google Street View
Address/Location317 Broadway, at Thomas Street, the former McDonald’s site
Developer/ApplicantShabse Fuchs (408 Hawthorn LLC); Hamish Whitefield Architects
ProjectA 21-story, 215-foot mixed-use building with 50 apartments, replacing a two-story structure (YIMBY, Crain’s).
StatusFiled; Site Work Permitted
Latest UpdateDOB issued a construction fence permit on Aug. 24, 2026 and a protection permit on Sept. 8, 2026. The new building itself, filed in May 2026, is not yet permitted.

A New Tower on Lower Broadway

The corner site is one of the few new-building filings in Tribeca with a sizeable unit count. A 2020 plan for a 20-story building on the same lot was disapproved.

Sources: NYC DOB NOW job M01400243-I1 and permits for BIN 1001656 (accessed Oct. 2026); New York YIMBY (June 2026); Crain's New York Business (May 2026)

7

80 West Broadway

Google Street View of 80 West Broadway, New York, NY
80 West Broadway, via Google Street View. — Imagery: Google Street View
Address/Location80 West Broadway, northwest corner of Warren Street
Developer/ApplicantAstral Weeks (AW Tribeca Holding); COOKFOX Architects
ProjectA 14-story, 145-foot condo building with 25 residences and about 90,000 square feet, per YIMBY. The DOB filing lists 13 stories, 21 units and about 71,600 square feet.
StatusDemolition; Building in Review
Latest UpdateDOB issued a construction-fence permit for the new building on Oct. 9, 2026. The new-building application itself is still in DOB objections.

Clearing the Corner

Demolition of the five-story buildings on the site began in late 2025, Tribeca Citizen reported, and YIMBY covered the final teardown in February 2026. An earlier rendering showed the tower cantilevering over its neighbors; that design is reported to be out of date.

Sources: NYC DOB NOW jobs M01290581-I1 and M01167560-I1 (accessed Oct. 2026); New York YIMBY (Feb. 2026); Tribeca Citizen (Jan. 2026); PincusCo

8

65 West Broadway

Google Street View of 65 West Broadway, New York, NY
65 West Broadway, via Google Street View. — Imagery: Google Street View
Address/Location65 West Broadway
Developer/ApplicantProsper Property Group and HM Group USA
ProjectA 10-story condo building with 23 residences and ground-floor retail on a long-empty lot (DOB, Tribeca Citizen).
StatusPermitted
Latest UpdateDOB issued a structural permit on Oct. 22, 2026 for revised shoring that allows construction of the new building, after sidewalk shed and fence permits on Sept. 30.

A Decade-Old Empty Lot Changes Hands

The site sat empty for about a decade after an earlier developer’s plans stalled. Prosper and HM Group USA bought it for $24 million in July 2026, The Real Deal reported, with a $68 million construction loan according to Tribeca Citizen. The building’s new-building permit dates from the earlier filing and is still active.

Sources: NYC DOB BIS job 121190497 and permits for BIN 1090819 (accessed Oct. 2026); The Real Deal (July 2026); Tribeca Citizen (July 2026)

Landmark-District Conversions, Boutique Condos & the Waterfront

Inside the historic districts, change comes building by building: a garage, a storage loft and a warehouse becoming homes, two small new condos, and the last piece of Pier 26.

9

56 North Moore Street

Google Street View of 56 North Moore Street, New York, NY
56 North Moore Street, via Google Street View. — Imagery: Google Street View
Address/Location56 North Moore Street, Tribeca West Historic District
Developer/ApplicantAlchemy (bought May 2026; prior owner Metro Loft Developers); ODA Architecture
ProjectConversion of a 1914, five-story parking garage into nine condominiums, with a two-story addition approved by Landmarks.
StatusPermitted
Latest UpdateDOB issued foundation, excavation-support and structural permits in June 2026 and a general construction permit on Oct. 13, 2026. The $15.4 million conversion filing itself is still in DOB review.

From Office Plan to Ultra-Luxury Condos

Alchemy closed on the garage for $58.5 million on May 5, 2026, according to BLDUP. The prior owner, Metro Loft, had planned a boutique office building with a rooftop addition approved by Landmarks in 2020 and 2021; the new owner is converting it to residences instead.

Sources: NYC DOB NOW jobs M01367190-I1 and M01362980 (accessed Oct. 2026); BLDUP (May 2026); New York YIMBY (Aug. 2020); NYC Landmarks permit LPC-21-05480

10

139 Franklin Street

Google Street View of 139 Franklin Street, New York, NY
139 Franklin Street, via Google Street View. — Imagery: Google Street View
Address/Location139 Franklin Street, Tribeca West Historic District
Developer/ApplicantBroad Street Development and TPG Angelo Gordon; Rawlings Architects
ProjectConversion of a 10-story commercial building into 13 condominiums, with facade reconstruction and rear-yard additions approved by Landmarks.
StatusPermitted
Latest UpdateLandmarks issued a permit on April 24, 2026. Since June, DOB has issued structural, standpipe, sprinkler and plumbing permits; the conversion filing submitted in September 2026 is in plan review.

A $44 Million Boutique Conversion

The partners paid $44 million for the building, according to JLL. The developers describe the project as staying within the original building envelope, while the DOB and Landmarks filings include an enlargement and rear-yard additions. Broad Street Development is also converting the Maritime Exchange Building in the Financial District.

Next door, 143 Franklin Street has its own Landmarks approval (July 2026) and a DOB filing to turn a warehouse into five apartments over retail.

Sources: NYC DOB NOW job M01400498-I1 (accessed Oct. 2026); NYC Landmarks permit LPC-26-08888; New York YIMBY (July 2025); JLL

11

31-35 Lispenard Street

Google Street View of 35 Lispenard Street, New York, NY
31-35 Lispenard Street, via Google Street View. — Imagery: Google Street View
Address/Location35 Lispenard Street, Tribeca East Historic District
Developer/ApplicantSilverLining Development; Marin Architects
ProjectAn 8-story, cast-iron-inspired residential building with about 20 apartments (DOB; 6sqft reports 19) and roughly 25,500 square feet.
StatusLandmarks-Approved
Latest UpdateLandmarks approved the design in April 2026 and issued a further permit on Oct. 7, 2026. DOB issued a construction-fence permit on Sept. 11; the new-building application is still in review.

New Construction in a Landmark District

New buildings in Tribeca’s historic districts need Landmarks’ approval of their design, and this one won it with a facade that echoes the area’s cast-iron lofts. A different owner’s 7-story plan for the site won Landmarks approval in 2020 but never went ahead.

Sources: NYC DOB NOW job M01387640-I1 (accessed Oct. 2026); NYC Landmarks permit LPC-27-00378 (Oct. 2026); 6sqft; Tribeca Citizen (Apr. 2026)

12

1 Walker Street

Google Street View of 1 Walker Street, New York, NY
1 Walker Street, via Google Street View. — Imagery: Google Street View
Address/Location1 Walker Street, also 249 West Broadway
Developer/ApplicantSumaida + Khurana; Ismael Leyva Architects
ProjectA 9-story, 125-foot boutique condo building with five residences, replacing a three-story building.
StatusFiled (Plan Review)
Latest UpdateAn application to demolish the existing three-story building was filed on Sept. 25, 2026. The new-building application filed in March 2026 is still in DOB objections.

Five Homes on a Prominent Corner

Sumaida + Khurana paid $18 million for the 4,650-square-foot site in 2024, The Real Deal reported, when it planned 10 stories. The condo offering for five units was filed in June 2026, according to Marketproof, and CityRealty lists a 2028 completion.

Sources: NYC DOB NOW jobs M01361838-I1 and M01454068-I1 (accessed Oct. 2026); The Real Deal (Dec. 2024); CityRealty; Marketproof (June 2026)

13

Hudson River Park Estuarium (Pier 26)

Google Maps of Pier 26, Hudson River Park, New York, NY
Pier 26 in Hudson River Park, via Google Maps. — Imagery: Google Maps
Address/LocationPier 26, Hudson River Park, West Street at North Moore Street
Developer/ApplicantHudson River Park Trust; Sage and Coombe Architects with EHDD
ProjectA one-story research and education center about the Hudson River estuary at the foot of Pier 26, about 7,000 square feet per Tribeca Citizen (DOB lists 10,655 square feet of construction).
StatusFiled (Plan Review)
Latest UpdateThe Hudson River Park Trust filed the new-building application on March 27, 2026; it is in DOB plan review.

The Last Piece of Pier 26

The estuarium is the final planned element of the rebuilt Pier 26. In 2024, Tribeca Citizen reported a cost of about $35 million with about $20 million committed; Hush Street has not found an updated funding figure or construction date.

Sources: NYC DOB NOW job M01364425-I1 (accessed Oct. 2026); Tribeca Citizen (June 2024); EHDD

What We're Watching Next

The draft environmental impact statement for the Independence Plaza tower, and how the city responds to the community board’s affordable housing demand, will be the biggest Tribeca development story of 2027. Closer in, watch whether work visibly starts at 65 Franklin Street, and what Rabsky files for 267 Broadway. Smaller items still moving through the agencies include the 8-story building planned for 88 Reade Street, where Nish Nush closed in June to make way for it, and the nearly finished condo at 14 White Street.

South of Chambers Street, Hush Street tracks the Financial District, where office towers are being converted into thousands of apartments, and the city’s plan for 100 Gold Street.

Header photo: the Tribeca skyline from Pier 26, by Tdorante10, via Wikimedia Commons, CC BY-SA 4.0, resized.

By Updated Built from city filings and published reporting. About Hush Street