Hush Street is tracking what’s being built in Flatiron, NoMad, Union Square, Gramercy and Kips Bay, between 14th and 34th Streets.
Much of the change here is happening inside old buildings rather than through new towers. The Flatiron Building is now 38 condominiums, and Elad Group and Sunlight Development are turning office buildings at 419 Park Avenue South and 95 Madison Avenue into condos. The first piece of the closed Beth Israel campus to be reused, a former nurses’ residence, now holds 87 rental apartments.
New construction includes a 20-story condo on Gramercy Park and a 27-story tower on Sixth Avenue. On the East River, the city and state are clearing Hunter College’s Brookdale campus for SPARC Kips Bay, a science, health and education campus of about two million square feet. On Broadway, the city is designing a permanent rebuild of the plazas around the Flatiron Building.
Where DOB records and press reports disagree on heights or unit counts, both are given. A permit is not treated as proof that construction has started.
| Project | Location | Status |
|---|---|---|
| 1The Flatiron Building (175 Fifth Avenue) | Fifth Ave. & Broadway at 23rd St. | Initial CO Issued |
| 2419 Park Avenue South | Park Ave. S. at E. 29th St. | Under Construction |
| 395 Madison Avenue (The Emmet Building) | Madison Ave. at E. 29th St. | Under Construction |
| 4313 Gramercy (313 East 17th Street) | E. 17th St., First–Second Aves. | Completed |
| 5Former Mount Sinai Beth Israel Campus | First Ave. at E. 16th St. | Closed; No Plan Filed |
| 6Gramercy Park Hotel (2 Lexington Avenue) | Lexington Ave. at Gramercy Park | Under Renovation |
| 7262 Fifth Avenue | Fifth Ave. at W. 29th St. | Topped Out; Finishing |
| 838 Gramercy Park East | E. 21st St. at Third Ave. | Under Construction |
| 9Loggia NoMad (842 Sixth Avenue) | Sixth Ave., W. 28th–29th Sts. | Topped Out |
| 1010 West 17th Street | W. 17th St., Fifth–Sixth Aves. | Under Construction |
| 1131-35 West 14th Street | W. 14th St., Fifth–Sixth Aves. | Topped Out |
| 12345 East 17th Street | E. 17th St. near First Ave. | Under Construction |
| 133 West 29th Street | W. 29th St. at Fifth Ave. | Stalled |
| 14335-339 Fifth Avenue | Fifth Ave. at E. 33rd St. | Filed (Plan Review) |
| 15110 East 16th Street | E. 16th St. at Union Square East | Approved |
| 1634 Union Square East | Union Sq. E. at E. 16th St. | Filed (Plan Review) |
| 17567 Second Avenue | Second Ave., E. 30th–31st Sts. | Filed (Plan Review) |
| 18SPARC Kips Bay | E. 25th St. at the FDR Drive | Demolition Under Way |
| 19Broadway Vision: Flatiron Plazas & Worth Square | Broadway, E. 21st–27th Sts. | In Design |
| 20Con Edison East River Heat Pump | E. 14th St. at the FDR Drive | Awaiting State Approval |
Conversions & Reopenings
Office buildings becoming condos, a hospital building becoming rentals and a hotel coming back.
1
The Flatiron Building (175 Fifth Avenue)
From Offices to $50 Million Penthouses
CNBC reported prices from about $10.95 million to more than $50 million for the 21st-floor penthouse. Scaffolding began coming down in April 2026, amNY reported.
Sources: CNBC (Jan. 2026); amNY (Apr. 2026); NYC DOB NOW job M01011711-I1 and CO records (Aug. 2026); NYC Planning ZAP 2024M0252
2
419 Park Avenue South
A WeWork Building Turned Condo
Elad bought the building for about $72 million in 2024, Crain’s reported. A few blocks away, lenders approved a conversion plan for Orda’s mostly vacant 233 Park Avenue South, though the owner has said it has no current desire to pursue it, according to The Real Deal.
Sources: Crain's New York Business (Aug. 2024); CityRealty (May 2026); NYC DOB NOW job M01223041-I1 (July 2026)
3
95 Madison Avenue (The Emmet Building)
A $99 Million Loan for the Conversion
BHI provided a $99 million loan for the project, The Real Deal reported in January 2025.
Sources: The Real Deal (Jan. 2025); New York YIMBY (May 2026); NYC DOB NOW job M01053870-I1 (July 2026)
4
313 Gramercy (313 East 17th Street)
The First Reuse of the Beth Israel Campus
Mount Sinai closed Beth Israel’s 16th Street hospital on April 9, 2025. No redevelopment filing has been found for the main hospital buildings. Minrav’s new rental at 345 East 17th Street is on the same block.
Sources: New York YIMBY (Jan. 2026); 6sqft; Mount Sinai Health System; NYC DOB NOW job M01170336-I1 and CO records (July 2026)
5
Former Mount Sinai Beth Israel Campus
A Large Empty Campus
The only part of the campus reused so far is the former nurses’ residence at 313 East 17th Street, now rental apartments (see the card above).
Sources: Mount Sinai Health System; NYC PLUTO, block 922 lots 2, 46 and 70 (accessed Oct. 2026); NYC DOB NOW and ACRIS records, block 922 (accessed Oct. 2026)
6
Gramercy Park Hotel (2 Lexington Avenue)
Late Against Its First Target
MCR took a 99-year lease in 2023 and said then that the hotel would reopen in 2025, NY1 reported. No official new opening date has been announced.
Sources: NY1 (Aug. 2023); 6sqft (Aug. 2023); NYC DOB NOW jobs M01178920-I1 and M01138293-I1 (Oct. 2026)
New Towers & Condos
From an 860-foot tower on Fifth Avenue to mid-rise rentals near Stuyvesant Square.
7
262 Fifth Avenue
A Tower That Blocks the View
The tower topped out in 2024 and drew criticism for blocking views of the Empire State Building, 6sqft reported. It faces the stalled 3 West 29th Street site across the street.
Sources: 6sqft; NYC DOB BIS job 122874906 (accessed Oct. 2026); NYC DOB NOW job M01454667-I1 (Sept. 2026)
8
38 Gramercy Park East
The First New Condo on Gramercy Park in a Century
Legion assembled the site, including air rights, for $47 million, YIMBY reported. Completion is posted on site as spring 2028.
Sources: New York YIMBY (May 2026); Multi-Housing News; NYC DOB NOW job M00951038-I1 and ECB records (Oct. 2026)
9
Loggia NoMad (842 Sixth Avenue)
From Modular Hotel to Condo
The site was planned as a 168-key AC Hotel before the DOB filing was amended to residential in 2025.
Sources: CityRealty (Apr. 2026); New York YIMBY (July 2026); NYC DOB BIS job 121204419 (accessed Oct. 2026)
10
10 West 17th Street
Rising Mid-Block in Flatiron
The structural permit was issued in December 2025, after foundation work was completed.
Sources: New York YIMBY (Nov. 2023); Marketproof (July 2026); NYC DOB NOW job M00951254-I1 (Oct. 2026)
11
31-35 West 14th Street
A New Building on the Busway
Demolition of the low-rise buildings on the site finished in March 2025, CityRealty reported.
Sources: CityRealty (Mar. 2026); NYC DOB NOW job M01096333-I1 (Oct. 2026)
12
345 East 17th Street
Leasing Soon Near Stuyvesant Square
It is on the same block as the 313 Gramercy conversion.
Sources: New York YIMBY (Oct. 2026); NYC DOB NOW job M00479953-I1 (Sept. 2026)
Sites in Waiting
Filed, approved or for sale, but not yet under way.
13
3 West 29th Street
A Foreclosed Office Site Up for Housing
Vanbarton took control at a foreclosure auction in April 2021, The Real Deal reported. DOB still lists the old office scheme under HFZ’s entity.
Sources: The Real Deal (Apr. 2021); BKREA (summarizing The Real Deal) (July 2025); NYC DOB BIS job 121204133 (accessed Oct. 2026)
14
335-339 Fifth Avenue
Where the Demarest Building Stood
The 1890 Demarest Building was demolished despite preservationists’ objections. YIMBY reported that construction was expected to start in mid-to-late 2026.
Sources: New York YIMBY (Nov. 2025); NYC DOB NOW jobs M01376293-I1, M01468131-I1 and M01468758-I1 (Oct. 2026)
15
110 East 16th Street
A Long-Held Garage Moves
Tishman has held the site for years. MSH Equities’ 34 Union Square East is on the same block.
Sources: The Real Deal (Feb. 2023); NYC DOB NOW jobs M00812125-I1 and M01310832-I1 (Apr. 2026)
16
34 Union Square East
A New Face on Union Square
YIMBY reported that no construction timeline has been announced.
Sources: New York YIMBY (Sept. 2026); NYC DOB NOW jobs M01364168-I1 and M01374181-I1 (Sept. 2026)
17
567 Second Avenue
Kips Bay's Largest New Residential Filing
YIMBY reported a completion target of late 2029. New Empire has also filed demolitions at 4-10 East 30th Street in NoMad.
Sources: New York YIMBY (July 2026); The Real Deal (Feb. 2026); NYC DOB NOW job M01437514-I1 (Oct. 2026)
Public Projects
A science campus on the East River, a permanent rebuild of Broadway’s plazas and a proposed heat pump for the steam system.
18
SPARC Kips Bay
Clearing the Brookdale Campus
The City Council approved the project in February 2025. Plans include a new accessible bridge over the FDR Drive at 25th Street.
Sources: NYCEDC; New York YIMBY (Dec. 2025); NYC Planning ZAP 2024M0158; NYC DOB NOW jobs M01290442-I1 and M01446075-I1 (Oct. 2026)
19
Broadway Vision: Flatiron Plazas & Worth Square
Making the Plazas Permanent
The plazas were first installed in 2008. A related concessions application (ZAP 2025M0252) entered public review in February 2026.
Sources: Streetsblog NYC (Feb. 2026); NYC DOT presentation to CB5 (Sept. 2026); NYC Planning ZAP 2025M0252
20
Con Edison East River Heat Pump
Heat From the River
In November 2025 Con Edison withdrew a separate thermal-storage part of the same request at its 74th Street plant. Con Edison’s sustainability report describes the East River heat pump as using river heat to add energy to the steam system.
Sources: Con Edison petition (NYS Department of Public Service) (May 2025); NYS Public Service Commission, Case 25-S-0350 (accessed Oct. 2026); Con Edison sustainability report
What We're Watching Next
Permits for Tishman’s 110 East 16th Street and the start of work at 335-339 Fifth Avenue, a buyer or plan for 3 West 29th Street, the full demolition at SPARC Kips Bay, a certificate of occupancy for 262 Fifth Avenue a reopening date for the Gramercy Park Hotel, any plan for the former Beth Israel campus and a state decision on Con Edison’s East River heat pump are next.
Hush Street also tracks Chelsea west of Sixth Avenue, including the Midtown South rezoning, Midtown East, the East Village and Greenwich Village & the West Village.
Header photo: the Flatiron Building and the towers around Madison Square, 2019, by Karol K, via Wikimedia Commons, CC BY-SA 2.0.
By Hush Street Editorial Updated Built from city filings and published reporting. About Hush Street





