8
Projects Tracked
1
Under Construction
3
Pre-Construction
Oct. 2026
Updated
Watch → 1 Rezoning Contested 1 Expansion Filed 1 In Procurement
What’s Changing
→
Quinlan Development Group secured $23.5 million in financing for its 23-story, 149-unit tower at 130 St. Felix Street, even after Community Board 2 voted against the rezoning.Apr. 2026
→
95 Rockwell Place filed an expansion application as excavation continued, with unit counts shifting across the permitting record from 158 to 182 to a pending higher figure.Feb. 2026
→
144 St. Felix Street’s 24-story residential tower atop a landmarked 1930s church won unanimous Landmarks Preservation Commission approval after contested public hearings.Mar. 2026
29 Grand Ave. Financing$13.1M
132-134 Waverly Ave. Financing$6.8M
See recent property activity →

Hush Street is tracking what’s changing in Fort Greene, the brownstone neighborhood built up around a Revolutionary War-era hilltop park and, a century later, around one of the country’s most important performing-arts institutions.

Much of Fort Greene’s current development story runs through the corner where the neighborhood meets Downtown Brooklyn: the Brooklyn Academy of Music’s decades-long push to build a real Cultural District around itself, finally finished in January 2025, and a wave of residential towers now rising along Ashland Place and Rockwell Place on BAM’s doorstep.

The rest of the story is older and slower-moving. A landmarked 1930s church has been approved to carry a 24-story apartment tower on its back. A decades-long, $200-million-plus NYCHA modernization is still underway at the Ingersoll Houses. And the city is about to spend $24 million rebuilding Fort Greene Park’s paths and drainage. Where a claim comes from a developer or city press release rather than independent reporting, we say so.

Project Location Status
1BAM Cultural District 300 Ashland Place Completed / Cultural Spaces Open
2The Everly 180 Ashland Place Construction Complete / Leasing
395 Rockwell Place 95 Rockwell Place Under Construction / Expansion Filed
4144 St. Felix Street 144 St. Felix Street Approved by LPC
5Ingersoll Houses Fort Greene Ongoing Capital Investment
6Fort Greene Park Fort Greene Park In Procurement
7130 St. Felix Street 130 St. Felix Street Financed / Rezoning Contested
8240 Willoughby Street 240 Willoughby Street Construction Complete / Leasing

The Projects Reshaping Fort Greene

Eight anchors, from a cultural district a decade in the making to a second landmarked-lot tower fight two blocks from the first, plus a 463-unit tower that changed hands at completion.

1

BAM Cultural District

300 Ashland Place tower in the BAM Cultural District, Fort Greene, Brooklyn
300 Ashland Place, home to the L10 Arts and Cultural Center. Photo by Kidfly182 via Wikimedia Commons, CC BY-SA 4.0.
Address/Location300 Ashland Place
Developer/ApplicantTwo Trees Management (tower); NYC Department of Cultural Affairs & NYCEDC (cultural spaces)
Project32-story, 460,000-sq-ft mixed-use tower anchoring Brooklyn’s official Cultural District
StatusCompleted / Cultural Spaces Open
Latest UpdateThe L10 Arts and Cultural Center’s cultural spaces opened January 28, 2025, more than a decade after the project was first approved

A Cultural District, Not Just a Tower

In 2004, the city designated a swath of Fort Greene and Downtown Brooklyn around BAM as an official Cultural District, with a plan to build new below-market performance and gallery space directly into the neighborhood’s new residential towers rather than treat culture and housing as separate problems. 300 Ashland Place, a 32-story metal-clad tower designed by TEN Arquitectos for developer Two Trees Management, was the plan’s most ambitious test: 379 apartments, 76 of them affordable, stacked on top of a purpose-built cultural podium.

The residential tower opened in 2017. The podium sat mostly unfinished for years afterward.

L10 Opens, a Decade Later

The wait ended January 28, 2025, when the city cut the ribbon on the L10 Arts and Cultural Center — a 65,000-square-foot space built with $84 million from the NYC Department of Cultural Affairs and NYCEDC. It gives BAM new cinemas and archival space, the Brooklyn Public Library its first branch dedicated entirely to arts and culture, MoCADA a proper gallery and performance space, and 651 ARTS its first-ever permanent home.

A few blocks away at 590 Fulton Street, the district’s other tower, The Ashland — sometimes called BAM North — delivered 586 rental units back in 2016, 300 Ashland’s twin, without its own dedicated cultural component.

Sources: Brownstoner; Brooklyn Eagle; NYCEDC

2

The Everly

Address/Location180 Ashland Place
Developer/ApplicantRockrose Development; architect SLCE Architects
Project49-story, 610-foot rental tower one block from the L10 Arts Center
StatusConstruction Complete / Leasing
Latest UpdateExterior work wrapped in February 2026, and an affordable-housing lottery has opened for the building

Fort Greene’s Newest Rental Address

The Everly rises 610 feet over Ashland Place, directly across from BAM — 418,092 square feet of studio-to-two-bedroom apartments with oversized windows and light oak floors, on top of a two-floor amenity package that includes golf and ski simulators, a coworking garden, and a rooftop pool. Rockrose’s own materials count 609 units; construction-completion coverage in early 2026 put the figure at 569 units instead. We haven’t been able to resolve the discrepancy, so we’re reporting both rather than picking one.

Leasing, With an Affordable Lottery Attached

Exterior work finished in February 2026, with the construction hoist removed from the building’s west side and the last sidewalk shed still standing along Ashland Place. An affordable-housing lottery has since opened for a mandated slice of below-market units at the building, required by the zoning that made a tower this size possible so close to the Cultural District.

The building’s amenity spaces, including its Game Den, are already open to residents:

Sources: New York YIMBY; Rockrose; Brooklyn Paper

3

95 Rockwell Place

Address/Location95 Rockwell Place
Developer/ApplicantCharney Companies; architect Fogarty Finger; interiors by Public Records
ProjectCondominium tower under construction between Lafayette Avenue and Fulton Street
StatusUnder Construction / Expansion Filed
Latest UpdateCharney filed in February 2026 to add roughly 10 stories and 50 units, using a transit-improvement bonus tied to the Nevins Street subway station

A Condo Tower at Fort Greene’s Edge

95 Rockwell Place sits at what Commercial Observer called the convergence of Fort Greene, Boerum Hill, Downtown Brooklyn, and Prospect Heights — reporting on the project has used all four neighborhood labels at different points. We’re covering it here given its Rockwell Place and Fulton Street address, on Fort Greene’s own side of BAM.

Charney Companies secured a $135 million construction loan in 2025 for a tower designed by Fogarty Finger, with sound and interior design curated by Public Records, the neighborhood’s own late-night listening bar. Demolition began in 2024, and excavation and piling work were underway by the end of 2025:

Bigger, If the City Says Yes

As financed and under construction, the project has been reported at both 158 units over 38 stories and 182 units over 45 stories at different points in its permitting history — we’re preserving the discrepancy rather than picking a number. In February 2026, Charney filed to go bigger still: roughly 240 units over 52 stories, using a transit-improvement bonus that requires the developer to privately fund upgrades to the nearby Nevins Street subway station. That filing hadn’t been approved as of this writing.

Sources: Commercial Observer; The Real Deal; New York YIMBY

4

144 St. Felix Street

Hanson Place Central United Methodist Church at 144 St. Felix Street, Fort Greene, Brooklyn
Hanson Place Central United Methodist Church, photographed before its approved tower addition. Photo by Kidfly182 via Wikimedia Commons, CC BY-SA 4.0.
Address/Location144 St. Felix Street
Developer/ApplicantStretke; architects FXCollaborative and ADP Architects
Project24-story, 240-unit residential tower built atop a landmarked 1930s church
StatusApproved by Landmarks Preservation Commission
Latest UpdateThe LPC gave unanimous final approval in March 2026, after multiple rounds of revision cut the tower from 27 stories to 24

A Tower Grows From a Landmark

Hanson Place Central United Methodist Church, a neo-Gothic 1930s landmark at the corner of St. Felix Street and Hanson Place, is becoming the base of a 285-foot residential tower. The plan restores both the St. Felix Street and Hanson Place facades, repairs masonry and cast-stone ornamentation, restores stained glass, and preserves religious iconography — while cutting new windows, doors, and a rooftop into the historic structure to meet code for the apartments rising above it. Of the tower’s 240 units, 60 are permanently affordable.

A Contested Approval

The project went through multiple Landmarks hearings before its unanimous approval in March 2026. Forty-six speakers at one hearing supported the plan, largely citing the need for new housing; 33 opponents called it out of scale, warned it would block views of the church’s clock tower, and used the word “facadism” to describe a design that keeps only the building’s shell. The design team responded by cutting the tower from 27 stories to 24 and lowering its height by roughly 30 feet before winning final sign-off.

Sources: New York YIMBY; Brownstoner; Brooklyn Paper

5

Ingersoll Houses

Address/LocationR.V. Ingersoll Houses, Fort Greene
Developer/ApplicantNYCHA; air-rights buyers Maddd Equities and Joy Construction
Project35-building, World War II-era public housing campus undergoing sustained capital investment
StatusOngoing Capital Investment
Latest UpdateA $38.2 million exterior brickwork and facade project spanning Ingersoll and Red Hook Houses (West) was completed in summer 2025

Decades of Public Investment

Ingersoll Houses opened in 1944 alongside the neighboring Walt Whitman Houses, and the city has spent more than $200 million since on comprehensive modernization across its 35 buildings — elevator service to every floor, enlarged apartments, new kitchens, and upgraded heating and electrical systems. That work continued in summer 2025, when NYCHA’s Asset and Capital Management division completed a $38.2 million exterior brickwork and facade upgrade spanning both Ingersoll and the Red Hook Houses (West), including new masonry, structural beams, and drainage.

Trading Air Rights for Repairs

In 2019, NYCHA closed a first-of-its-kind deal, selling roughly 180,000 square feet of Ingersoll’s unused development rights to private developers Maddd Equities and Joy Construction for about $25 million earmarked for building repairs. The air rights let the developers roughly double the size of a planned tower a few blocks away, now addressed as 202 Tillary Street.

That building, financed at $143 million and built using Ingersoll’s transferred air rights, finished construction in 2026 as a 465-unit, 31-story tower with 120 affordable apartments — a direct, if indirect, product of Ingersoll’s own capital needs. Hush Street’s Downtown Brooklyn tracker covers it in full; we’re linking to it here rather than duplicating that reporting.

Sources: Crain’s New York Business; Akerman LLP; New York YIMBY

6

Fort Greene Park

Fort Greene Park in Brooklyn
Fort Greene Park. Photo by David Shankbone via Wikimedia Commons, CC BY-SA 3.0.
Address/LocationFort Greene Park
Developer/ApplicantNYC Parks
Project$24 million reconstruction of the park’s western entrances, paths, plaza, and drainage
StatusIn Procurement
Latest UpdateNYC Parks unveiled a new design for the $24 million western-edge reconstruction, combining two previously separate park projects into one

Fixing a 19th-Century Park’s Drainage Problem

Fort Greene Park, laid out in part by Frederick Law Olmsted and Calvert Vaux on a hill fortified during the Revolutionary War, is getting its largest infrastructure overhaul in years. The $24 million project reconstructs entrances, plaza spaces, and internal paths, replaces aging drainage infrastructure blamed for stormwater erosion, and adds three new ADA-compliant entrances along with new lighting, trees, and plantings. It also rebuilds the stairs on DeKalb Avenue near the hospital.

Two Old Plans, Combined Into One

NYC Parks folded two previously separate, long-delayed western-edge projects into this single reconstruction after community pushback over tree loss led to a redesign. As of the most recent public reporting, the project remained in procurement, being prepared for solicitation — a reminder that public infrastructure work, unlike a private tower, doesn’t move on a developer’s marketing timeline.

Sources: NYC Parks; BKReader; Fort Greene Park Conservancy

7

130 St. Felix Street

Address/Location130 St. Felix Street
Developer/ApplicantQuinlan Development Group; architect FXCollaborative
Project23 stories, ~149 units, with a Brooklyn Music School expansion at the base
StatusFinanced / Rezoning Application Contested
Latest UpdateCommunity Board 2 voted against the project’s rezoning application in 2026, though financing and design work have continued regardless

A Second Tower on the Same Landmarked Block

Two blocks from the church tower at 144 St. Felix Street, a second contested Fort Greene tower is working its way through the approval process on the same street. Quinlan Development Group bought the site — a surface parking lot behind the Brooklyn Music School, in the BAM Historic District’s context — for roughly $17 million and lined up about $23.5 million in acquisition and pre-development financing from Mavik Capital.

The current design, by FXCollaborative (the same firm behind 144 St. Felix’s tower), calls for a roughly 23-story, 149-unit building with ground-floor retail and an expanded home for the Brooklyn Music School, replacing an earlier, differently-sized proposal for the same lot from a previous owner, Gotham Organization, that also drew neighborhood opposition.

Financed Ahead of a Contested Vote

Brooklyn Community Board 2 voted against the project’s rezoning application in 2026, citing scale and context concerns within the historic district — but Quinlan’s financing and predevelopment work have proceeded regardless of that advisory vote, which does not bind the City Planning Commission’s eventual decision. As of this update, city votes on the rezoning are still pending.

Sources: Hoodline; Commercial Observer; Brownstoner; NYC Planning ZAP

8

240 Willoughby Street

240 Willoughby Street in November 2024, mid-construction. The building topped out and finished leasing by mid-2025; a more current photo wasn't available at publication. — Imagery: Google Street View
Address/Location240 Willoughby Street, across from Fort Greene Park
Developer/ApplicantBuilt by Rabsky Group; owned since July 2025 by a Fetner Properties/MCB Real Estate/Farallon Capital Management joint venture; architect FRW Architects
Project30-story, 463-unit rental tower, 147 units permanently affordable, 30,000 sq ft of amenities
StatusConstruction Complete / Leasing
Latest UpdateA Fetner Properties-led joint venture bought the newly finished building and assumed its ground lease for $209.5 million in July 2025, with M&T Realty Capital issuing a $141.5 million acquisition loan

A Former Hospital Site, Not the Hospital’s Own Megaproject

240 Willoughby Street rises on a site Rabsky Group bought from the Brooklyn Hospital Center in 2019 for $95 million — a separate transaction from, and not to be confused with, the hospital’s own still-unfiled roughly $1 billion modernization plan for its main DeKalb Avenue/Ashland Place campus a few blocks away, which Hush Street tracks separately as a watchlist item. Rabsky secured a $140 million construction loan in early 2025 when the 30-story tower was nearly complete, and finished construction that June.

Sold at the Finish Line

Rather than lease up the building itself, Rabsky sold it — ground lease and all — the month construction wrapped. A joint venture of Fetner Properties, MCB Real Estate, and Farallon Capital Management paid $209.5 million in July 2025, with JLL representing the seller and also helping the buyers arrange a $141.5 million acquisition loan from M&T Realty Capital. At the time of the sale, the building — studios through two-bedrooms, plus penthouse units on the top four floors — was about 25% leased; 147 of its 463 units are set aside as permanently affordable.

Sources: Multi-Housing News; New York YIMBY; MCB Real Estate

What We’re Watching Next

A 72-story, 1,263-unit tower planned for 395 Flatbush Avenue Extension sits right on Fort Greene’s border with Downtown Brooklyn — Community Board 2 covers both neighborhoods, and coverage of the project has called it both a Downtown Brooklyn tower and a Fort Greene one. Hush Street covers it in full as part of What’s Being Built in Downtown Brooklyn?, where the site itself more clearly sits, rather than duplicating that reporting here.

Two more rental towers have quietly finished nearby: 20 Rockwell Place, a 40-story, 1,098-unit building, and 570 Fulton Street, a 23-story, 163-unit building, both completed in 2025. At 96 Saint Edwards Street, Slate Property Group is finishing an 11-story, 105-unit supportive-housing building designed by Aufgang Architects. And at 80 Greene Avenue, a renovation of the Greene Clermont Houses senior residence has locked in affordability for its 97 units for another 40 years — smaller stories than the six above, but part of the same neighborhood.

Two more nearby buildings have also wrapped up: The Elliot, a 9-story, 101-unit building at 151 South Elliott Place developed by Mendel Berkowitz, finished construction in 2025 and completed its own affordable-housing lottery that May; and around the corner from the BAM Cultural District, Hanson Place Community Plaza, a 13-story, 104-unit affordable building at 142 South Portland Avenue developed by the Hanson Place Church Support Corporation — the same church family behind 144 St. Felix Street’s tower — finished in 2024.

Capital & Transactions

Money Moving in Fort Greene

A curated look at recent property sales and financing that help explain who’s buying, building, and lending in Fort Greene right now. Drawn from New York City’s public ACRIS property records, not a complete log of every filing — we include only transactions that say something real about the neighborhood’s direction, and leave out routine paperwork, internal transfers, and deals we can’t explain responsibly.

Property Financing$13.1M

29 Grand AvenueAug. 2026

A large, clean mortgage from a major institutional lender, placed on a property that city tax records show is currently an underbuilt parking garage — the classic profile of acquisition or pre-development financing on a future redevelopment site, though no press confirmation of specific plans exists yet.

Borrower: 29 Grand BESS LLC · Lender: National Bank of Canada · ACRIS record ↗ · Hush Street Deal record →

Permanent Financing$6.8M

132-134 Waverly AvenueSep. 2026

A Fannie Mae agency permanent loan placed on two just-completed small rental buildings — the same construction-to-permanent takeout pattern already seen at Boerum Hill’s 52 4th Avenue, here on a smaller scale.

Borrowers: 132 Waverly Ave SPE LLC / 134 Waverly Ave SPE LLC · Lender: PGIM Real Estate Agency Financing LLC (assigned to Fannie Mae) · ACRIS record ↗

Source: New York City’s public ACRIS property records. This module is reviewed and curated by Hush Street editors, not an automated feed, and will be updated as new, meaningful filings are confirmed.