The Carroll Gardens Library branch, Clinton and Union Streets, Brooklyn
Development Tracker — Carroll Gardens

What’s Being Built in Carroll Gardens? New Developments, Renovations & Public Projects to Watch

Tracking new construction, renovations, and public infrastructure projects in Carroll Gardens, Brooklyn — from a new 82-unit apartment building to a $160M sewer overhaul.
6
Projects Tracked
2
Under Construction
1
Pre-Construction
Sept. 2026
Updated
Watch → 1 Delayed
What’s Changing
→
Brooklyn Public Library set a Dec. 1, 2026 reopening for the Carroll Gardens Library, after targets of July 2025 and summer 2026 passed.Nov. 2026
→
Carroll Gardens’ $181 million renovation-wave figure was re-confirmed after a methodology correction found earlier permit-pull totals had double-counted re-filed permits.Jun. 2026
→
Smith-9th Streets — the world’s highest elevated subway station, with no elevator since 1933 — became one of 60+ stations funded for accessibility upgrades under the MTA’s approved 2025-2029 Capital Plan.Aug. 2025
Under Construction2
Pre-Construction1
Completed1
See full project list →

Hush Street is tracking what’s changing in Carroll Gardens — a neighborhood whose small, six-block landmarked core is only part of the story. Most of Carroll Gardens sits outside that historic district, on blocks zoned for real mixed-use construction, and it shows: this pass found the neighborhood’s first new upscale apartment building in roughly 15 years, a $160 million sewer overhaul, a century-old subway station finally getting elevators, and a long-delayed library renovation now headed for a Dec. 1 reopening, alongside a renovation wave worth $181 million since 2023.

We also found — and excluded — a 517-unit development marketed and covered almost universally as “Gowanus,” on blocks that technically fall inside Carroll Gardens by street grid alone. We explain that call, and a couple of smaller ones like it, below rather than quietly folding them in.

ProjectLocationStatus
1The Carroll33 4th StreetCompleted
2The Carroll Gardens Library’s Long, Delayed Renovation396 Clinton StreetUnder Construction / Reopening Dec. 1
3Elevators Coming to Smith-9th StreetsSmith & 9th StreetsFunded / Planned
4A $160 Million Rewiring of Carroll Gardens’ SewersCourt St. to the CanalActive / Multi-Phase
5Court Street Road Diet & ReconstructionUnion St. to Hamilton Ave.Under Construction
6Carroll Gardens’ $181 Million Renovation WaveNeighborhood-wideActive / Ongoing

The Projects Reshaping Carroll Gardens

From the neighborhood’s first new apartment building in 15 years to a $181 million renovation wave.

1

The Carroll

33 4th Street in May 2022 — the site before construction, as seen in Google Street View. The Carroll was completed in January 2026 and is not pictured. — Imagery: Google Street View
Address/Location33 4th Street
Developer/ApplicantShimon Hoffman (developer); IMC Architecture (architect)
Project82-unit rental building, 23 units affordable via NYC Housing Connect
StatusCompleted
Latest UpdateCompleted and occupied as of January 2026 — described by multiple outlets as Carroll Gardens’ first new upscale multifamily building in roughly 15 years

A Different Kind of Development, on a Different Kind of Block

Carroll Gardens’ famous landmarked core — the rowhouses along Carroll, President, and the numbered Places — can’t produce a building like this. It’s a fully built-out historic district; new construction there isn’t possible.

The Carroll sits outside that district, on a stretch of 4th Street zoned under the Fourth Avenue Subdistrict’s mixed-use overlay, which permits real ground-up multifamily construction. The eight-story, 82-unit rental building opened in January 2026, with 23 units set aside as affordable housing through NYC Housing Connect for households earning up to 130% of area median income.

Multiple outlets covering the opening described it as the neighborhood’s first new upscale apartment building in roughly 15 years — a marker of how rare ground-up construction actually is here, even outside the historic district.

For a closer look at the building, including a discrepancy between press reports and city parcel data over its exact story count, see Hush Street’s standalone Brief on The Carroll.

Sources: Informed Infrastructure; News 12 Brooklyn

2

The Carroll Gardens Library’s Long, Delayed Renovation

The Carroll Gardens branch of the Brooklyn Public Library at the corner of Union and Clinton Streets, Brooklyn
The Carroll Gardens Library at Union and Clinton Streets, photographed in 2009 — well before the branch’s current 2023–2026 closure and renovation. Photo by Jim.henderson via Wikimedia Commons, CC0.
Address/Location396 Clinton Street, at Union Street
Developer/ApplicantNYC Department of Design and Construction (first phase); Brooklyn Public Library (owner/operator, second phase)
ProjectRenovation of the historic 1905 Carnegie branch: new teen space, HVAC, lighting and fire-safety upgrades, then elevator, bathroom and shelving work
StatusUnder Construction / Reopening Dec. 1
Latest UpdateBrooklyn Public Library says the branch will reopen on Dec. 1, 2026, at 2 p.m., after missing targets of July 2025 and summer 2026. The pop-up at 250 Baltic Street set Nov. 6 as its last day

A Carnegie Branch, Closed Since 2023

The Carroll Gardens branch — one of five Carnegie-funded libraries built in Brooklyn, opened in 1905 with a barrel-vaulted ceiling — has been closed since July 2023 for a two-part renovation, the first part managed by the Department of Design and Construction and the second by Brooklyn Public Library.

The scope covers a new teen space on the mezzanine level, a new heating and cooling system, new architectural lighting throughout the main floor, and upgrades to the fire alarm and safety systems. The library’s final, six-month phase covers elevator upgrades, renovated bathrooms, a water fountain, new and restored shelving, and interior improvements.

What Went Wrong With the Timeline

The renovation was originally supposed to wrap up in July 2025. After opening up the historic vaulted ceiling to do the planned work, DDC determined the structure needed additional reinforcement to support the new HVAC units, pushing the completion date to summer 2026. That date passed too. Brooklyn Public Library now says the major milestones are complete and the branch will reopen on December 1, 2026.

A pop-up branch at 250 Baltic Street in neighboring Cobble Hill stood in for the library during the closure. The library set Nov. 6 as the pop-up’s last day, to prepare for the reopening.

Sources: Brooklyn Eagle; Brownstoner; BKReader; Brooklyn Public Library (Nov. 2026)

3

Elevators Coming to Smith-9th Streets

The Smith-9th Streets station's elevated structure, 87.5 feet above street level. — Imagery: Google Street View
Address/LocationSmith-9th Streets station (F/G lines), Carroll Gardens’ southern edge
Developer/ApplicantMetropolitan Transportation Authority
ProjectFirst elevators at the world’s highest elevated subway station, 87.5 feet above street level
StatusFunded / Planned
Latest UpdateIncluded in the MTA’s 2025–2029 Capital Plan, approved by the state legislature in 2025; no construction timeline announced yet

Ninety-Two Years Without an Elevator

Smith-9th Streets has been the highest elevated subway station in the world since it opened in 1933 — 87.5 feet above street level, serving the F and G lines at Carroll Gardens’ southern edge near the Gowanus Canal crossing.

It has never had an elevator. That’s set to change: the station is one of more than 60 across the system slated for accessibility upgrades under the MTA’s 2025–2029 Capital Plan, which the state legislature approved in 2025.

The MTA hasn’t said when construction will start or when the elevators will open — only that the station made the funded list.

Sources: NY1; amNewYork; Brooklyn Paper

4

A $160 Million Rewiring of Carroll Gardens’ Sewers

The Gowanus Canal viewed from 9th Street, on Carroll Gardens' southern boundary, Brooklyn
The Gowanus Canal from 9th Street, on Carroll Gardens’ southern boundary — the waterway the neighborhood’s sewer overhaul is designed to protect. Photo by Peak Player via Wikimedia Commons, CC BY-SA 4.0.
Address/LocationCarroll Gardens/Gowanus sewershed — DEP’s project area runs from Court Street to the Gowanus Canal, and from Douglass Street to 4th Street
Developer/ApplicantNYC Department of Environmental Protection
ProjectSewer rebuild plus two combined-sewer-overflow retention tanks (8M and 4M gallons)
StatusActive / Multi-Phase
Latest UpdateThe 4-million-gallon tank’s perimeter wall was completed in early fall 2025; excavation inside it is expected to begin in early 2026

Rebuilding the Sewers Under a Superfund Cleanup

As part of the Gowanus Canal Superfund cleanup, the city is rebuilding the combined sewer system serving Carroll Gardens’ eastern blocks and neighboring Gowanus. DEP’s own stated project area runs from Court Street to the canal, and from Douglass Street down to 4th Street.

Separately, DEP is building two large underground tanks — 8 million and 4 million gallons — that will hold excess stormwater and sewage during heavy rain instead of letting it overflow directly into the canal. The city says it has invested roughly $160 million in this work so far, cutting combined sewer overflows into the canal by nearly 30%.

Where Things Stand

The 4-million-gallon tank’s perimeter wall was completed in early fall 2025, with excavation inside the tank expected to begin in early 2026. A 100% design report for dredging the canal’s middle segment was also approved in 2025.

Sources: NYC Department of Environmental Protection; NYS DEC fact sheet

5

Court Street Road Diet & Reconstruction

Court Street through Carroll Gardens, the segment of the corridor covered here. — Imagery: Google Maps
Address/LocationCourt Street, through Carroll Gardens from Union Street to Hamilton Avenue
Developer/ApplicantNYC Department of Transportation
ProjectRoad diet: one travel lane removed for the corridor’s first protected bike lane, plus pedestrian islands and curb extensions
StatusUnder Construction
Latest UpdatePresented to Brooklyn Community Board 6 in June 2025; work is active, with no public completion date found

One Project, Two Neighborhood Trackers

This is the same 1.3-mile DOT project we’re tracking on our Cobble Hill page, continuing south along Court Street through the full length of Carroll Gardens to Hamilton Avenue at the edge of Red Hook.

For Carroll Gardens, it touches the neighborhood’s entire eastern spine — from the library and historic-district blocks down to the Smith-9th Streets and Hamilton Avenue corridor. DOT presented the project to Brooklyn Community Board 6 in June 2025; work was still active as of the most recent source found in this pass, with no completion date announced.

Sources: NYC Department of Transportation, Community Board 6 presentation, June 2025; Brooklyn Bridge Parents streetscape roundup, October 2025

6

Carroll Gardens’ $181 Million Renovation Wave

Row houses along President Street in the Carroll Gardens Historic District, Brooklyn
Row houses along President Street, representative of Carroll Gardens’ rowhouse character generally, not any specific address described below. Photo by Dmadeo via Wikimedia Commons, CC BY-SA 3.0.
Address/LocationNeighborhood-wide, landmarked and non-landmarked blocks alike — 439 distinct addresses
Developer/ApplicantNo single developer — an aggregate trend across many individual property owners
Project1,087 permits worth $25,000+ since Jan. 2023, totaling $181.4 million
StatusActive / Ongoing
Latest UpdateCorrected September 2026: our original count double-counted permits that get re-filed for renewal, inflating the total. The figures here are recalculated to count each job once.

A Bigger Number Than Cobble Hill’s, and a Different Kind of Story

Carroll Gardens’ landmarked historic district covers only six blocks — a small fraction of the neighborhood. Most of Carroll Gardens sits outside it, on blocks that permit real renovation and expansion work at a scale the historic district itself can’t match.

Setting aside The Carroll’s own new-construction permits, we pulled every Department of Buildings permit filed across Carroll Gardens’ full working boundary since January 2023, filtered to jobs worth $25,000 or more. The result, after correcting for permits that reappear multiple times in the city’s own records as they get renewed: 1,087 distinct jobs, spread across 439 addresses, totaling just over $181.4 million in declared construction value — still a bigger number than our Cobble Hill tracker’s equivalent figure, reflecting Carroll Gardens’ larger footprint and its mix of landmarked rowhouses with higher-density blocks nearby, though we’re no longer citing an exact multiple pending a similar check of that figure.

A Correction: Renewals Were Inflating Our Own Numbers

An earlier version of this section put the total at $340.3 million and flagged one figure — a reported $12 million in permits at 477 Sackett Street, for a project press described as a fairly modest expansion — as a discrepancy we couldn’t explain.

We found the explanation: New York City’s own permit records repeat a job’s declared cost every time that permit gets renewed, sometimes five or more times over a couple of years for the same piece of work. Counting each renewal as a new dollar figure, rather than counting each job once, was inflating every total in this section — 477 Sackett Street’s real figure is about $2.3 million once renewals are removed, in line with the modest project press described. We’ve corrected the neighborhood-wide total and every figure below to match.

What’s Actually Largest, Corrected

With renewals removed, the largest individual total belongs to 23 Carroll Street at roughly $4.4 million, followed by 92 3rd Street (about $4.2 million) and 505 Court Street (about $4.2 million) — all substantial renovation or expansion jobs, none of them outliers against the scale of work described for them.

Sources: NYC DOB permit records (DOB NOW: Build)

Have a tip on a Carroll Gardens project we should be tracking? Let us know.

By Updated Built from city filings and published reporting. About Hush Street