Restoration Plaza in Bedford-Stuyvesant
Development Tracker — Bedford-Stuyvesant

What's Being Built in Bedford-Stuyvesant? New Developments & Construction Projects

Hush Street tracks Bedford-Stuyvesant's development story: the Fulton Park megaproject, a yeshiva-led rezoning, a mosque's senior housing plan, and Restoration Plaza's redesign.
6
Projects Tracked
1
Under Construction
4
Pre-Construction
Oct. 2026
Updated
Watch → 1 Resident Skepticism
What’s Changing
→
City Council approved Khalifah Residences' 144-unit affordable senior building at 1166 Bedford Avenue, which will continue housing the mosque and its Clara Muhammad School.Jul. 2026
→
The City Planning Commission approved the Park Avenue Brooklyn Rezoning's six mixed-use buildings — 391 units, 101 affordable — across land held by three religious institutions.Aug. 2026
→
YS Developers and Rabsky Group filed permits for a 99-unit building at 1150 Broadway after acquiring the site for $23.5 million.Aug. 2026
Under Construction1
Pre-Construction4
See full project list →

Hush Street is tracking what’s changing in Bedford-Stuyvesant — and the pattern that emerges isn’t the generic gentrification story outsiders usually tell about this neighborhood.

It’s an institutional one. The four largest development stories active in Bed-Stuy right now aren’t driven by conventional private developers buying up brownstones. They’re driven by land-rich, capital-constrained institutions monetizing or rebuilding what they already own: a 209-unit public housing complex on a 99-year ground lease, a network of Orthodox Jewish yeshivas trading air rights for new school space, a mosque partnering with a developer to fund senior housing, and the nation’s first community development corporation reimagining its own headquarters.

That’s not to say private, conventional real estate has vanished from Bed-Stuy — it hasn’t, and this Tracker covers a couple of clear examples. But the biggest, most consequential projects here in 2026 all trace back to an institution that already held the land, not a developer who assembled it.

Where a claim comes from a developer, agency, or institution’s own materials rather than independent reporting, we say so.

Project Location Status
1Fulton Park Redevelopment 1754 Fulton St. & 53 Utica Ave. ULURP / Scoping
2Park Avenue Brooklyn Rezoning 446-448 Park Avenue CPC Approved
31166 Bedford Avenue 1166 Bedford Avenue City Council Approved
41150 Broadway 1150 Broadway Site Acquired / Permits Filed
51826 Fulton Street 1826 Fulton Street Under Construction
6Restoration Innovation Campus 1368 Fulton Street Design Unveiled

The Institutions That Own Bed-Stuy Are Rebuilding It

Six anchors: a public-housing megaproject on a ground lease, a yeshiva network’s air-rights rezoning, a mosque’s senior-housing partnership, two conventional private buildings, and the nation’s first community development corporation redesigning its own plaza.

1

Fulton Park Redevelopment

Part of the existing low-rise Fulton Park complex, via Google Street View. — Imagery: Google Street View
Address/Location1754 Fulton Street & 53 Utica Avenue
Developer/ApplicantL+M Development Partners & SMJ Development, with NYC HPD; Urban Architectural Initiatives and Fogarty Finger (design)
Project12 new buildings (6-17 stories), ~1.91M sq ft, ~2,035 total apartments replacing a 209-unit, 38-building 1980s complex
StatusULURP / Scoping
Latest UpdateAn environmental scoping meeting was held February 19, 2026, with the formal ULURP process — community board, borough president, and City Council review — still ahead

From Urban Renewal to “Smurf Village” to Redevelopment

This is, by a wide margin, the largest single development story in Bed-Stuy today, and it comes with real history attached. The complex was originally called Hunterfly Estates, built 1981-1986 as part of the Fulton Park Urban Renewal Project — a product of exactly the same era of federally backed urban-renewal financing that produced Brownsville’s own NYCHA campuses a few miles south. Its 38 low-rise, three-story buildings, arranged around courtyards with Dutch stepped-gable rooflines, earned it a lasting nickname: residents and neighbors call it “Smurf Village.”

In 2023, a limited liability company tied to L+M Development Partners secured a 99-year ground lease on the site for about $28.1 million. L+M and SMJ Development, in partnership with the city’s own Department of Housing Preservation and Development, now plan to demolish the complex’s 209 Section 8 apartments and replace them — along with a vacant, HPD-owned parcel next door — with 12 new buildings up to 17 stories, roughly 2,035 apartments in all.

A Real Promise, and Real Tenant Skepticism

The developers’ central commitment is that no current resident will be displaced: each of the 209 existing households is promised a new unit with the same bedroom count and the same rent they pay today, moving directly into finished replacement apartments — expected to begin in 2029 — rather than a temporary relocation. Beyond the replacement units, the plan calls for 351 more apartments as 100% affordable housing on the HPD-owned portion of the site, plus an estimated 337 to 505 additional affordable units through the city’s Mandatory Inclusionary Housing program layered on top of the market-rate buildings. Full buildout isn’t expected until 2036 — a decade-plus construction timeline for a neighborhood that will be living immediately adjacent to it the whole time.

Not every resident is reassured. News 12 spoke with tenants who questioned whether towers up to 17 stories would really preserve the low-rise, courtyard-centered community the current complex is known for. One resident said plainly: “It’d be cool if they were actually putting us in the new buildings” — skepticism that a promise made years before a 2036 completion date will actually hold. Others worried the density increase itself, not just the construction process, would change the character of a place explicitly valued today for being only three stories tall.

Sources: Brownstoner; Crain’s New York Business; Bisnow; News 12 Brooklyn; Our Time Press

2

Park Avenue Brooklyn Rezoning

An existing light-industrial building on Park Avenue, via Google Street View. — Imagery: Google Street View
Address/Location446-448 Park Avenue
Developer/ApplicantPark Avenue Rezoning Partners LLC — land held by Beth Chana School, Central United Talmudical Academy & Yeshiva Ahavas Israel, among others
ProjectSix mixed-use buildings (391 apartments, 101 affordable) plus three new/reconfigured yeshiva buildings serving roughly 2,200 students
StatusCPC Approved
Latest UpdateThe City Planning Commission approved the rezoning application (C 240218 ZMK) on August 24, 2026; City Council review is the next step

Yeshivas as Landowners, Not Just Tenants

Where Fulton Park is public housing rebuilding itself, this rezoning is private religious education doing something similar. The applicant, Park Avenue Rezoning Partners LLC, controls land owned by several Orthodox Jewish institutions — Beth Chana School, Central United Talmudical Academy, and Yeshiva Ahavas Israel among them. The Real Deal framed the winning applicant team as “unlikely developers” — schools, not real estate firms, driving a rezoning of this scale.

The approved plan trades industrial-zoned land for two things at once: three new yeshiva buildings (five stories each, 60 to 75 feet), consolidating and expanding capacity to roughly 2,200 student seats, and six separate mixed-use residential buildings, seven to 11 stories, with 391 apartments — 101 of them permanently income-restricted through Mandatory Inclusionary Housing. The city’s own City Planning Commission calendar filing (C 240218 ZMK) is the primary record of the August 2026 approval.

A Genuine Scope Question, Not Yet Resolved

Coverage of this project isn’t fully consistent on scale — some early reporting on the broader Park Avenue corridor described a larger, roughly 560-unit ambition, while the version that actually won City Planning Commission approval in August 2026 is smaller, at 391 units. Hush Street is not treating this as a contradiction to silently resolve: it likely reflects a real, disclosed scope reduction between an early proposal and the version that survived the city’s own review process — exactly the kind of filed-vs.-announced discrepancy worth tracking rather than smoothing over. The approved application is the authoritative figure as of this Tracker.

Sources: NYC City Planning Commission (calendar filing); Brooklyn Borough President (application); NY DEC (environmental notice)

3

1166 Bedford Avenue

Bedford Avenue near 1166 Bedford Avenue, via Google Street View. — Imagery: Google Street View
Address/Location1166 Bedford Avenue
Developer/ApplicantKhalifah Residences LLC — Kalel Companies & Masjid Abdul Muhsi Khalifah
Project12-story, ~94,000-sq-ft building with 144 affordable senior apartments over mosque and school space, ~$90 million
StatusCity Council Approved
Latest UpdateThe City Council approved the rezoning in July 2026, following a certification in January 2026 — clearing the way for construction to begin

A Third Institution, a Third Playbook

This is the neighborhood’s third distinct example of an institution redeveloping its own land, and it’s structured differently from either of the first two. Masjid Abdul Muhsi Khalifah — a mosque that has occupied roughly 44,000 square feet at this site for years, alongside its affiliated Clara Muhammad School — partnered with developer Kalel Companies to form Khalifah Residences LLC, which has filed to rezone the site from R6A/C2-4 to R7X/C2-4.

The plan would raze the current three-story building and replace it with a 12-story building — the city’s own land-use filing puts it at 75,602 square feet, somewhat smaller than the roughly 94,000 square feet cited elsewhere: 144 affordable apartments reserved for seniors, plus 4,823 square feet of ground-floor commercial space and 13,412 square feet of community-facility space across the first three floors — space the mosque and the Clara Muhammad School would continue to occupy, now inside a much larger building than either currently has. The project is projected to cost at least $90 million.

Approved

The application (ULURP nos. 260162ZMK/260163ZRK) was certified for public review in January 2026 and reached City Council review by mid-2026; the New York City Council approved the rezoning in July 2026, clearing the mosque’s redevelopment for construction.

Sources: Crain’s New York Business; Commercial Observer; Kalel Companies; NYC ZAP project 2025K0154 (Socrata hgx4-8ukb)

4

1150 Broadway

A fenced lot near 1150 Broadway, via Google Street View. — Imagery: Google Street View
Address/Location1150 Broadway
Developer/ApplicantYS Developers & Rabsky Group
Project11-story, 115-foot, ~71,137-sq-ft mixed-use building with 99 residences
StatusSite Acquired / Permits Filed
Latest UpdateYS Developers and Rabsky Group acquired the site for $23.5 million and filed permits, August 2026

The Neighborhood’s Conventional Counter-Example

Not everything in Bed-Stuy fits the institutional pattern above, and it’s worth including one project that doesn’t — a straightforward private acquisition and as-of-right filing, the kind of deal that would look at home in almost any rezoned Brooklyn corridor. YS Developers, whose name has come up in Hush Street’s Crown Heights and Clinton Hill coverage for similar plays, teamed with Rabsky Group to buy this Broadway site for $23.5 million and file permits for an 11-story, 99-unit building.

The site sits along Broadway’s elevated JMZ line, a corridor of century-old commercial buildings and rail infrastructure rather than a quiet residential block — a genuinely different physical setting from the other four anchors in this Tracker, and a reminder that Bed-Stuy’s development story, even with its strong institutional throughline, isn’t reducible to a single pattern everywhere in the neighborhood.

Sources: New York YIMBY (permit filing); The Real Deal (site acquisition)

5

1826 Fulton Street (“Brooklyn Gardens”)

Address/Location1826 Fulton Street
Developer/ApplicantLM Developments (Yisroel/Jacob Landau); architect J Frankl Architects
ProjectTwo 11-story, as-of-right buildings, 297 apartments total (69 income-restricted), on a former nursing-home parking lot
StatusUnder Construction
Latest UpdateThe westernmost 11-story building has topped out, with windows installed and scaffolding still up; ground preparation for the second building is underway

A Nursing Home’s Parking Lot, As-of-Right

Not every private project in Bed-Stuy needs a rezoning. LM Developments took title to this former parking lot — long tied to a since-closed Providence Care Inc. nursing home next door — in August 2025, and because existing zoning already allows it, is building two 11-story, boxy white-paneled apartment buildings without going through public review at all: 213 units in the first building (52 income-restricted) and 84 in the second (17 income-restricted), 297 total. Landau and partner Pinches Abowitz secured a $52 million construction loan for the project in 2025.

Sources: Brownstoner; Brooklyn Paper; New York YIMBY

6

Restoration Innovation Campus

Restoration Plaza in Bedford-Stuyvesant
Restoration Plaza on Fulton Street. Photo by Meelar, CC BY-SA 4.0 / Wikimedia Commons.
Address/Location1368 Fulton Street
Developer/ApplicantBedford Stuyvesant Restoration Corporation; Adjaye Associates (design)
Project84,000-sq-ft cultural/commercial campus expansion, including the Billie Holiday Theatre and new public open space
StatusDesign Unveiled
Latest UpdateBSRC unveiled the “Restoration Innovation Campus” design, developed with the community through a 2019 visioning process

The Country’s First CDC Redesigns Its Own Home

This last anchor is the oldest institution of the five, and arguably the one that makes the others legible. The Bedford Stuyvesant Restoration Corporation was founded in 1967 under a federal “Special Impact Program” championed by Robert F. Kennedy — widely credited as the country’s first community development corporation, a model since replicated nationally. Restoration Plaza, its Fulton Street headquarters, has anchored roughly $500 million in Central Brooklyn investment since BSRC’s founding.

The unveiled plan, designed by Sir David Adjaye’s firm in partnership with community input gathered starting in 2019, would add roughly 84,000 square feet of new cultural and commercial space to the plaza — expanding both its existing Cultural Center and the storied Billie Holiday Theatre, a 218-seat venue founded in 1972 that has anchored Black theater in Brooklyn for over five decades — alongside two new commercial buildings and additional public open space. At the January 2023 unveiling, BSRC’s CEO put the first construction phase at $150-175 million, with the city already having committed $50 million toward it — but more than three years later, no groundbreaking, updated budget, or construction timeline has been reported.

Sources: Brooklyn Paper; Our Time Press; Restoration Plaza

The Throughline Across All Six

Read together, these five projects are not five unrelated news items — they’re the same underlying pattern showing up in public housing, Orthodox Jewish education, Islamic institutional life, and Black cultural philanthropy alike. Each institution holds land or a building it can no longer adequately fund through its original mission alone, and each has turned to a real estate partnership — a ground lease, a rezoning, a joint-venture LLC, a design commission — to generate the capital or the physical capacity its mission actually needs. Fulton Park’s public housing stock and Restoration Plaza’s cultural campus are both, in their own way, legacies of the mid-1960s to 1980s federal urban-investment era; watching whether their current reinvestment cycles deliver on scale comparable to that original era is one of the more interesting long-run questions in this Tracker.

What We’re Watching Next

The clearest open question is whether Fulton Park’s tenant-relocation promises hold up over what will likely be a decade-plus construction timeline, and whether the Park Avenue rezoning’s City Council vote preserves the 391-unit, 101-affordable figure the City Planning Commission approved. 1166 Bedford Avenue has already answered its own open question from this Tracker’s first pass — the City Council approved it in July 2026 — so the next thing worth watching there is whether construction actually starts. Restoration Plaza’s design still hasn’t attached an updated funding source or timeline, more than three years after its original unveiling.

Bed-Stuy borders Crown Heights and Clinton Hill to the south and west and Brownsville to the southeast; none of those neighborhoods’ own projects were absorbed into this Tracker. The Weeksville Heritage Center’s historic-house restoration, often described as sitting on the Bed-Stuy/Crown Heights line, was completed in February 2026 and is accordingly not covered here as a current construction story.

By Updated Built from city filings and published reporting. About Hush Street