The Old Eastern Athletic Club Space Is Under Construction. Is It Still Open Squash?

View this post on Instagram

A reel of 111 Hicks Street, the St. George Tower address, from the builder MNC Contractors, which credits Studio Hillier with the architecture and design. Studio Hillier describes the project as a reworking of 52,000 square feet of the former hotel’s recreation complex for sport, wellness and community. No opening date has been announced.Instagram · @mnccontractors · posted Apr. 17, 2026

In 2023, a nonprofit called Open Squash announced it would turn the old Eastern Athletic Club space into an affordable, ten-court squash center. Real construction is now underway at that exact address — but nothing in the public record since 2025 ties it to Open Squash, and Open Squash’s own current locations don’t include Brooklyn Heights at all.

Under ConstructionOperator and Opening Date UnconfirmedBSA Calendar 308-79-BZIV, extension of term and operator change, granted June 2025; no public opening date

Last verified August 28, 2026. Active Department of Buildings permits and a Landmarks Preservation Commission storefront approval confirm real, funded construction. No source states who will operate the finished space, or when it opens. See “The Open Squash Question” below.

Site43 Clark Street / 111 Hicks Street, Brooklyn Heights (St. George Tower), within the Brooklyn Heights Historic District
Space52,000 sq ft, below grade through the 2nd floor, on a 29-year lease
Planned usePrivate wellness and racquet-sports club; exact program undisclosed
LesseeTRL 43 Clark LLC (BSA filing); trade press names East Gate Investors & SC Holdings
ApprovalBSA extension and operator change for an existing gym-use variance; not a rezoning

Eastern Athletic Club ran a gym in the lower levels of St. George Tower for more than 50 years before it closed for good in May 2023. Within weeks, a nonprofit called Open Squash said it would turn the space into an affordable, community-oriented squash center — the kind of story that writes itself.

Three years later, the story is more complicated. Real construction is underway at 43 Clark Street. Permits are active. A decades-old zoning variance for the space has been formally extended. But the public record built since 2025 doesn’t connect any of that work to Open Squash — and Open Squash’s own current locations don’t include Brooklyn Heights at all.

Below: what’s documented about the building and the closed gym, what Open Squash actually announced in 2023, what’s genuinely under construction now, and the open question this page exists to track.

A Gym That Outlasted the Hotel It Was Built In

A short history of the Hotel St. George by McNeil Tours, a Brooklyn Heights walking-tour guide. The reel follows the hotel from its late-19th-century beginnings through its Art Deco peak, when, per the post, it had 17 ballrooms and a saltwater pool, to its decline and a later fire. As the post notes, riders using the Clark Street subway station still pass through the building.Instagram · @mcneiltours · posted Aug. 6, 2025

St. George Tower began as the Hotel St. George, built in stages between 1885 and 1929 at the corner of Clark and Hicks streets. At its peak it was the largest hotel in New York City, with 2,632 rooms. It became a 275-unit residential co-op in 1984; the co-op, St. George Tower & Grill Owners Corp., is the landlord for the gym space (Block 231, Lots 17 and 19; BIN 3001726).

A gym occupied the building’s lower levels and ground floor for decades afterward. Eastern Athletic Club was its longest-running operator, running the space for more than 50 years before closing for good on May 31, 2023.

The building’s own marketing still hasn’t caught up. St. George Tower’s “Prospective Buyers” page currently lists “the Eastern Athletic health club” as a building amenity — three years after it closed. It’s a small, telling reminder that even a building’s own website can lag well behind reality, and a reason not to take any single source’s framing of “current” at face value.

The Plan That Was Announced: A Nonprofit Squash Center

Two weeks before Eastern Athletic closed, Open Squash — a 501(c)(3) nonprofit dedicated to making squash more accessible and affordable — announced it would take over the space.

The plan, as described in 2023, was substantial: a renovation designed by Marvel Architects with interiors by Bricault Design, targeting completion in the fourth quarter of 2024. Open Squash’s own announcement gave a court count of 8; independent coverage at the time instead reported 9 courts on a lower level plus 1 upper-level court, for 10 total. Neither figure has been confirmed against the project actually under construction today — both describe only the 2023 plan.

In September 2023, Open Squash opened a location at 100 Pearl Street in the Financial District — one subway stop from Brooklyn Heights, and explicitly framed at the time as an interim measure “while the Clark Street renovation proceeds.”

What’s Actually Being Built Now

St. George Tower, the former Hotel St. George, at the corner of Clark and Hicks streets in Brooklyn Heights
St. George Tower, at 43 Clark Street / 111 Hicks Street — the former Eastern Athletic Club occupied the lower levels and ground floor. Photo by Clyde Charles Brown via Wikimedia Commons, CC BY-SA 4.0.

In May 2025, commercial real-estate trade press reported a very different deal for the same address: a 29-year lease for 52,000 square feet — the below-grade level, ground floor, and second floor — to East Gate Investors and SC Holdings, brokered by Helmsley Spear.

“The co-op envisions a high-end private health, wellness and sports facility and club that will offer a superior suite of amenities unavailable today within this vibrant Brooklyn neighborhood.”Michael Dubin, Executive Managing Director, Helmsley Spear, announcing the lease

An SC Holdings spokesperson described the space as being “built around wellness, racquet sports, leisure and community.” That’s the only program detail any of the four independent trade-press accounts of the deal gives — none mentions squash by name, and none mentions Open Squash.

The actual named lessee in the public record is a single-purpose entity, TRL 43 Clark LLC. A Board of Standards and Appeals filing from the same month — Goldman Harris LLC representing the co-op as owner and TRL 43 Clark LLC as lessee — sought and won an extension of term and change of operator for the space’s physical-culture-establishment variance. The case number, 308-79-BZIV, implies the underlying variance dates back to 1979 — meaning this gym use has likely been continuously covered by the same zoning variance, through a succession of different operators, for close to half a century. The filing also confirms the site’s R7-1 zoning within the historic district. How TRL 43 Clark LLC relates to East Gate Investors and SC Holdings isn’t spelled out in any public document.

Since then, the Department of Buildings has issued permits for a $5 million cellar-and-basement renovation and a further $220,000 structural reinforcement job, and the Landmarks Preservation Commission — the site sits within the Brooklyn Heights Historic District — approved a storefront Certificate of No Effect in May 2026, with another LPC filing following in July. Taken together, that’s a real, funded, actively permitted construction project, not a stalled announcement.

The Open Squash Question

What the record does and doesn’t showNo source Hush Street has found — the four 2025 trade-press accounts of the lease, the BSA filing, the DOB or LPC permit records, or Open Squash’s own current materials — connects Open Squash to the project now under construction at 43 Clark Street. Open Squash’s own April 2026 announcement of a new Williamsburg location describes the organization as operating two existing facilities, Bryant Park and FiDi, with Williamsburg as a third. Brooklyn Heights doesn’t appear in that count at all.

That’s a striking gap for an organization that publicly announced, by name and by address, that it was renovating this exact space. It’s possible Open Squash still has some undisclosed role — as a future tenant, an operating partner, or a programming partner within a larger club it doesn’t itself lease or brand. Nothing Hush Street has found confirms that, and nothing rules it out.

What can be said with more confidence: the entity that actually holds the lease and the zoning approval, per primary government records, is TRL 43 Clark LLC, tied in press coverage to East Gate Investors and SC Holdings — not to Open Squash. And Open Squash’s own public accounting of its footprint, as of its most recent expansion announcement, doesn’t include this address.

One additional correction worth noting here: an earlier pass on Hush Street’s Brooklyn Heights development tracker attributed this project’s architecture to Bjarke Ingels Group. That appears to be a mix-up. Bjarke Ingels does own a penthouse unit elsewhere in St. George Tower and separately filed his own 2019 landmarks application for a rooftop addition to that unit — a personal matter, unconnected to the ground-floor commercial project as far as Hush Street can tell. The builder, MNC Contractors, credits Studio Hillier with the design of the current project in an April 2026 post (shown at the top of this page), and a 2026 DOB filing at 43 Clark Street lists Studio Hillier as the applicant’s business.

This page will be updated if a source ever documents who is actually going to operate the finished space, and when it’s expected to open.

What Happens Next

Construction appears to be genuinely underway, backed by real money and active permits, inside a zoning variance that’s just been extended for this express purpose. That much is documented.

What isn’t documented is an opening date, a finished program (how many courts, if any; what “racquet sports” actually means here), or — the open question this page exists to answer — who will actually be running it. Those are the three things to watch for next.

Timeline

Full timeline · 12 entries
1885–1929
Hotel St. George built

Built in stages at the corner of Clark and Hicks streets; at its peak, the largest hotel in New York City, with 2,632 rooms.

1984
Converted to St. George Tower co-op

The hotel becomes a 275-unit residential cooperative. A gym use in the lower levels — later operated by Eastern Athletic Club — continues under what appears to be the same physical-culture-establishment variance for decades afterward.

May 15, 2023
Open Squash announces its Brooklyn Heights plan

The nonprofit says it will renovate the soon-to-close Eastern Athletic space into a squash center, targeting completion in the last quarter of 2024.

May 31, 2023
Eastern Athletic Club closes

The gym closes for good after more than 50 years at this address.

Sept. 2023
Open Squash opens an “interim” location instead

A location at 100 Pearl Street in the Financial District opens, explicitly described at the time as a stopgap “while the Clark Street renovation proceeds.”

Q4 2024
Open Squash’s original target date passes

No source found confirms a Brooklyn Heights opening occurred on this schedule, or at all.

May 2025
A different lease is reported: 52,000 sq ft, 29 years

Commercial real-estate trade press reports East Gate Investors and SC Holdings signed a long-term lease for a private wellness and racquet-sports facility at St. George Tower. None of the coverage mentions Open Squash.

June 2025
Zoning variance extended; first permit filed

The Board of Standards and Appeals grants an extension and operator change for the space’s decades-old gym-use variance. A $5 million cellar/basement renovation permit is filed with the Department of Buildings.

Nov. 2025
Structural permit filed

A second DOB permit, for structural reinforcement work, is filed.

Apr. 2026
Open Squash calls Williamsburg its “third location”

Announcing a new 55 Kent Avenue facility, Open Squash and the press covering it describe the organization as operating Bryant Park and FiDi, with Williamsburg as a third. Brooklyn Heights is absent from the count.

May–Jul. 2026
Landmarks approvals continue

LPC approves a storefront Certificate of No Effect in May, with a further LPC filing in July — signs of active, ongoing project work.

Unconfirmed
Opening date and current build-out status

As of Aug. 28, 2026, no source states an opening date, a completion date, or the physical state of construction beyond the permit record.

Primary Documents and Sources

Update Log

Oct. 30, 2026
Added the builder’s April 2026 post naming Studio Hillier as the current project’s designer, and redesigned the page’s opening; the secondary facts from the old summary box now sit in the relevant sections.
Aug. 28, 2026
First published. Reporting drew on NYC BSA, DOB and LPC permit records, commercial real-estate trade press, and Open Squash’s own public materials. Central finding: no source connects Open Squash to the project currently under construction at this address, and Open Squash’s own location count as of its most recent expansion announcement omits Brooklyn Heights. Stated as an open question, not a confirmed fact either way — see “The Open Squash Question.”

This Spotlight expands on and corrects the St. George Tower Wellness Club entry in Hush Street’s Brooklyn Heights development tracker.

By Updated Built from city filings and published reporting. About Hush Street

Leave a Reply

Your email address will not be published. Required fields are marked *